Pictured here is the temporary sheet pile which was used to divert the river

rock riffle wellness

The Inlet (Left: culverts just under the surface) Pictured here is the bypass culvert outlet. They would serve to handle the input / output Farewell, Old Friend!ĬLICK HERE TO SEE THE LAKELAND PUBLIC TELEVISION You Have Been A Faithful Old Piece of ConcreteĬity's History & Have Been The Focal Point River bed below the surface of the water. It is interesting to see the layout of the

  • Once Completed, the Water Began to Lower at the Steps and at the Old Dam.
  • Then Turned Southward Back Toward the Bridge to Re-Route Water Away From the Old Dam.
  • Placement of the Sheet Pile Continued West to East Into the River Creating a Water Bypass.
  • Joining the next by a "Ball & Channel" design, This is a wall made up of 2' wide steel panels thatĪre pounded vertically under the surface, each With the surface depth & width satisfactory,Ī trench was dug into which the sheet piles
  • With the Rock Causeway in Place, a Dirt "Road" Was Fashioned Over The Rock Surface.
  • Native rocks & boulders from the surroundingĪrea are being used to make the causeway.
  • Construction of a Rock Causeway Across the River Channel Began.
  • The Bathroom Building & Some Trees in the City Park Were Removed.
  • As Landwehr Construction began gathering rock and boulders off-site for the rock riffle project, construction of the Rock Riffle project began at the site Monday, October 18 th with removal of material under the TH 84 Bridge.